BAE Systems wins contract to modernize Arleigh Burke-class destroyer USS Mitscher


According to a press release published by BAE Systems on January 6, 2022, the company has received a $1.9 million contract from the U.S. Navy for the maintenance and modernization of the Arleigh Burke-class guided-missile destroyer USS Mitscher (DDG 57). 
Follow Navy Recognition on Google News at this link


Russian Vyborg Shipyard laid the Purga ice class coastguard ship of project 23550 925 001 Arleigh Burke-class guided-missile destroyer USS Mitcher (Picture source: U.S. Navy)


The value of the competitively awarded contract could reach $101.2 million if all options are exercised.

Under the docking selected restricted availability (DSRA) contract awarded, BAE Systems will dry-dock the ship, perform underwater hull preservation work, support the Navy’s efforts to upgrade the ship’s Aegis combat system and its command and control equipment, and refurbish the living spaces for the ship’s 285 crewmembers. The work is expected to begin in March 2022 and be completed in April 2023.

BAE Systems’ Norfolk shipyard is performing similar work aboard the guided-missile destroyer USS Stout (DDG 55).

USS Mitscher is an Arleigh Burke-class in service with the United States Navy. It was constructed by Ingalls Shipbuilding, in Pascagoula, Mississippi on an order in December 1988.

The Arleigh Burke-class of guided missile destroyers (DDGs) is a United States Navy class of destroyer built around the Aegis Combat System and the SPY-1D multifunction passive electronically scanned array radar.

These warships were designed as multi-mission destroyers, able to fulfill the strategic land strike role with Tomahawk missiles; anti-aircraft warfare (AAW) role with powerful Aegis radar and surface-to-air missiles; anti-submarine warfare (ASW) with towed sonar array, anti-submarine rockets, and ASW helicopter; and anti-surface warfare (ASuW) with Harpoon missile launcher.