HII holds keel authentication ceremony for Virginia class submarine Arkansas


According to a PR published by HII on November 19, 2022, Newport News Shipbuilding (NNS) division hosted a keel authentication ceremony for Virginia-class submarine Arkansas (SSN 800).
Follow Navy Recognition on Google News at this link


Russian Vyborg Shipyard laid the Purga ice class coastguard ship of project 23550 925 001 Keel authentication ceremony for the Virginia class submarine USS Arkansas. (Picture source: HII)


NNS welders etched a historic six sets of initials of the Little Rock Nine onto metal plates, signifying the keel of SSN 800 as being “truly and fairly laid.” The metal plates will remain affixed to the submarine throughout its life.

Arkansas is the 27th Virginia-class fast attack submarine being built under the teaming agreement with General Dynamics Electric Boat.

NNS is one of only two shipyards capable of designing and building nuclear-powered submarines. The advanced capabilities of Virginia-class submarines increase firepower, maneuverability, and stealth.

The Virginia-class submarine has a length of 114.8 m, and a beam of 10.36 m. The submarine can reach a top speed of 28 miles per hour (45 km/h). She has a crew of 132 people including 15 officers and 117 enlisted.

The Virginia-class Block I to IV is armed with 12 VLS Vertical Launching System (Tomahawk BGM-109) tubes, four 533 mm torpedo tubes (Mk-48 torpedo), RGM-84 Harpoon, 25 torpedoes & missiles (torpedo room) + 12 missiles (VLS tubes).

Block IV Virginia-class submarines incorporate design changes focused on reduced total ownership cost. By making these smaller-scale design changes to increase the component-level lifecycle of the submarine, the U.S. Navy will increase the periodicity between depot maintenance availabilities and increase the number of deployments.

This milestone on Arkansas comes following the delivery of USS Montana (SSN 794), the launch of New Jersey (SSN 796), and continued progress on Massachusetts (SSN 798) at NNS earlier in 2022, as the shipyard continues to invest in its workforce and facilities to make steady progress on delivering these important assets to the Navy.